OrCAD X Resources

The PCB Bill of Materials

Issue link: https://resources.pcb.cadence.com/i/1545331

Contents of this Issue

Navigation

Page 6 of 8

To highlight the importance of analyzing supply chain data during part selection, let's consider a real-world example. In a recent survey, we asked engineers to choose between four SMD part options based on the following information: MPN Supplier Description Average Price 1 C0402C102J5GACTU KEMET Corporation Cap Ceramic 0.001uF 50V C0G 5% Pad SMD 0402 125 °C T/R $0.02 2 CL05C102JB5NNND Samsung Electro-Mechanics Cap Ceramic 0.001uF 50V C0G 5% Pad SMD 0402 125 °C T/R $0.02 3 GRM1555C1H102JA01B Murata Manufacturing Cap Ceramic 0.001uF 50V C0G 5% Pad SMD 0402 125 °C Bulk $0.01 4 C0402C102J5GACAUTO KEMET Corporation Cap Ceramic 0.001uF 50V C0G 5% Pad SMD 0402 125 °C Automotive T/R $0.05 The results were predictable, with 41% of respondents selecting the Murata Manufacturing supplier with the lowest price and therefore an increased chance of higher revenue. MPN: C0402C102J5GACTU | Supplier: KEMET Corporation MPN: CL05C102JB5NNND | Supplier: Samsung Electro-Mechanics MPN: GRM1555C1H102JA01B | Supplier: Murata Manufacturing MPN: C0402C102J5GACAUTO | Supplier: KEMET Corporation 17% 29% 41% 14% Given the same information, which would YOU have chosen? Data-Driven Decision Making Which Would You Choose? 6 www.cadence.com

Articles in this issue

Links on this page

view archives of OrCAD X Resources - The PCB Bill of Materials