OrCAD X Resources

OrCAD X High-Speed Digital Design Guide Part 2

Issue link: https://resources.pcb.cadence.com/i/1534759

Contents of this Issue

Navigation

Page 16 of 72

e. Then double-click on the L2 layer set or select it, then use the > button to move it over to the right column and click OK. 5. Once Layer sets are created, you will get what looks like below for the DDR3_DATA Electrical CSet. 6. For nets that need a topology, such as address and command nets, apply the Daisy Chain Schedule and choose Verify Schedule to the Electrical CSet (seen below). 17 www.cadence.com OrCAD X High-Speed Digital Design Guide

Articles in this issue

Links on this page

view archives of OrCAD X Resources - OrCAD X High-Speed Digital Design Guide Part 2