e. Then double-click on the L2 layer set or select it, then use the > button to move it over to the right column and click
OK.
5. Once Layer sets are created, you will get what looks like below for the DDR3_DATA Electrical CSet.
6. For nets that need a topology, such as address and command nets, apply the Daisy Chain Schedule and choose Verify
Schedule to the Electrical CSet (seen below).
17 www.cadence.com
OrCAD X High-Speed Digital Design Guide