Issue link: https://resources.pcb.cadence.com/i/1180270
Getting Started with Symphony Team Design Getting Started with Symphony Team Design October 2019 67 Product Version 17.4-2019 Example 1: Client performing a Slide operation and display as seen by other clients: 1. Client #1 selects a cline using slide command. 2. Other clients see the selected cline with temporary lock display color-coded to the client performing the slide. This prevents other clients from acting on the cline. 3. Client #1 selects a new location for the cline bubbling other clines along the way and generating temporary locks on other effected traces. A preview of the Slide results will be seen using the current etch layer color stripped with the temporary highlight color while in the slide command. 4. Client #1 completes slide command, changes are integrated by server, and final updates are dispatched to all clients. Example 2: Two clients perform an add connect and display as seen by other clients: 1. Group routing from resistors to TSSOP IC using add connect. ❑ Client #1 (Purple) selects the upper eight resistors connections to the IC. ❑ Client #2 (Green) selects the lower eight resistors connections to the IC.