Cadence PCB Best Practices

Getting Started with Symphony Team Design

Issue link: https://resources.pcb.cadence.com/i/1180270

Contents of this Issue

Navigation

Page 67 of 85

Getting Started with Symphony Team Design Getting Started with Symphony Team Design October 2019 68 Product Version 17.4-2019 ❑ Client #3 (Blue – shown in the following figure) will see the pin-pair connection with a temporary lock display color coded to the client performing the route. Note: Other clients see the selected pins with temporary lock display color coded to the user performing the routing. This prevents other clients from selecting the pins for routing the same connections. 2. All clients see a preview of the route using the current etch layer color stripped with the temporary highlight color. 3. After Client #1 and #2 complete the connections, right-clicking and choosing Done sends the update to the server for integration. 4. Server dispatches the final updates to all clients.

Articles in this issue

view archives of Cadence PCB Best Practices - Getting Started with Symphony Team Design