Issue link: https://resources.pcb.cadence.com/i/1010255
Start Process Parts Exist? Enterprise Integrate Related Originator/ Capture User Searches for desired part in OrCAD CIP (Component Information Portal) Place part on schematic Yes Originator uses CIP Compliance Module to search for Manufacturers part (including compliance and obsolescence) and can investigate any part detail. No Teamcenter (TC) PLM Related Create new Library project in OrCAD EDM (Engineering Data Management). Associate users. New OrCAD EDM Library Project? Yes No New or Updated ECAD Model required Create ECAD Model from OrCAD, OrCAD Library Builder, Download from Ultralibrarian for OrCAD New Open Library Check-in ECAD Model Checkout ECAD Model and make change(s) Update New ECAD Model Required? Yes Additional parametrics added; TMP (CIS Temporary) part created; CIP Automatically emails PCB Designer & CE the link to new TMP part Capture CIS/ CIP User Component Engineer (CE) Role End Process No Peer Review Footprint & STEP Create / Update Footprint or STEP Footprint & STEP Verified OK? No Enterprise Integrate synchronizes OrCAD part parametric data with PLM data (Batch Sync Process); Manually invoked or scheduled Cron Job Component Engineer (CE) Opens CIP from email link. Evaluates TMP part Valid Part request Invoke "Covert to PLM" for TMP part in CIP No CE deletes TMP part or assigns alternate existing part number Originator will be emailed via CIP delete notification or via the CIS Part Manger updating schematic End Process Originator will detect change including PCN status in CIP or via the CIS Part Manager Part Released in PLM/ Part set to release state or applied ECO revision End Process Approved? Yes Enterprise Integrate converts TMP part to real unreleased PLM part in OrCAD Database & create PLM part CPN Part Status set to Release (New or ECO) Yes Any Additional parametric data added to OrCAD CIP. CE Verifies all items have been checked. YES Allegro PCB Designer Yes FOOTPRINT & STEP VERIFICATION COMPONENT ATTRIBUTE & SYMBOL VERIFICATION Teamcenter PLM WORKFLOW ECO Tech Review & CCB Review & approval for design, new or updated Parts. No Updates invoked per reject notice No Sample Cadence-OrCAD/ Teamcenter PLM New/ ECO Part Process Flow Color Key PCB Designer Opens CIP from email link. Evaluates TMP part SiliconExpert (SE) Related PCN alert received via SE notification system which is provided to responsible party (Typically CE Role involved is part workflow signoff) TC BOM with any new/ change parts is uploaded to SE BOM Manager providing analytics of obsolescence, risk analysis and compliance of affected part(s) Suitable cross referenced part is investigated via SE Part Search and applied to BOM Library Content Providers and Creation Library Management NPI Process and Automatic Notification Librarian Role