Issue link: https://resources.pcb.cadence.com/i/1545418
Access and Governance f Role-based permissions are configured with approval authority separate from request authority f Required fields are enforced at part creation so that incomplete records cannot be approved f NPI workflow includes mandatory supply chain verification steps before part approval f Automated notifications are active for part request submission and approval f Temporary parts are available so designers are not blocked during NPI review f Detailed history and revision tracking is enabled for all part modifications f External partner access (CM, ODM) is controlled via a read-only web portal Display and Part Selection f Conditional display rules hide obsolete, NRND, and LTB parts from standard part selection f Counterfeit risk rating is visible to designers at the point of part selection f Lifecycle risk rating is visible at part selection, not only in the library administration view f Saved search configurations are available for common compliance and sourcing filter sets f Real-time distributor data including price, lead time, and availability is accessible without leaving the design environment Active Management f High-frequency supply chain data (price, lead time, availability) updates automatically on a defined schedule f Parts not reviewed within the defined review window are automatically flagged for librarian attention f Supply chain event monitoring is active for EOL announcements, LTB notifications, PCNs, and counterfeit alerts f Design teams are notified when a library component used in an active program has a status change f Obsolete parts with no active design usage are removed from the selectable library and archived BOM and Downstream Integration f BOM generation pulls directly from library records without manual re-entry f Approved alternates are included in the BOM as documented sourcing options f Compliance data in the BOM reflects verified library data, not a separate spreadsheet f PLM or ERP integration is bidirectional and synchronized f Library-to-schematic synchronization is automated so that approved part changes propagate without manual intervention 19 www.cadence.com Managing Your Component Library for Supply Chain Resilience
