Issue link: https://resources.pcb.cadence.com/i/1180264
Working with Backdrilling Backdrilling October 2019 40 Product Version 17.4-2019 © 1999-2020 All Rights Reserved. Selecting the yellow cell on the layer pair row from BOTTOM to LAYER_4_P opens a dialog to explain the violation: Note: The fabrication vendor can adjust the To Layer to meet their minimum stub length after backdrill which would result in them moving it to LAYER_5 with the stub spanning two layers. All Backdrill data will still be generated, even when these Warnings exist. Tip Backdrill Analysis can take into consideration the specified Manufacturing Stub Length and make adjustments during layer pair creation by setting a special environmental variable. ■ Set the environmental variable BACKDRILL_LAYER_PAIR_ADJUSTMENT ■ Select Layer Pair Initialization button in the Layer Pairs tab